Now viewing: Rossport Solidarity Camp » Photo gallery » peat haulage 2011 » Fri 25 Nov Trucks stopped
Fri 25 Nov Trucks stopped
These photos are from Friday 25th November 2011, the first two from 7.30am when four campaigners stopped quarry trucks from delivering stone to the tunnelling compound in Aughoose. The road was blocked for over an hour and a half. The second two photos are from later that day when someone climbed on top of a peat truck, stopping all Shell traffic for 3 and a half hours.



